A free tool for VDC teams that enforces the right sequence — loading before coordination, tier hierarchy before clash resolution, and a weekly commit cycle that holds every trade accountable.
Most coordination tools track clashes. This one tracks the conditions that make clashes inevitable — and enforces the sequence of decisions that prevents rework.
Every discipline submits their elements at the required level of development. The VDC manager tracks per-discipline confidence and runs the five-point loading gate. Nothing in this phase is about solving — it is about confirming the problem is fully visible.
Unlocked only after the loading gate is passed. Constraints are resolved in tier order — T1A gravity first, then structural, then primary MEP, then secondary. Any coordination that starts before the gate passes is automatically flagged as premature.
Why this matters: Coordination that starts before all disciplines are loaded produces solutions built against an incomplete picture. When the missing elements arrive, every resolved clash must be re-checked. The loading gate exists to prevent that rework — and to make it visible when a team is about to make that mistake.
| Tier | Category | Coordinate when |
|---|---|---|
| T0 | Absolute fixed — regulatory / legal | Before project design begins |
| T1 | Structural primary — EOR approval to change | Before any MEP routing |
| T1A | Gravity drainage — physics constrained, building-height scope | Before any ceiling plenum coordination |
| T2 | Fixed program — owner decision to change | Before primary MEP |
| T3 | Primary MEP distribution — duct, pipe, bus duct mains | Before secondary MEP |
| T4+ | Secondary MEP, branch work, devices, ceiling | Last |
The tracker follows the natural sequence of a pre-construction coordination project. Each step builds on the one before.
No account, no install, no server. Every file runs directly in your browser. Your project data stays on your machine in an open, readable JSON format.
This tool grew out of years of pre-construction coordination work and a consistent frustration with the gap between how coordination software works and how coordination actually works. The loading gate, the tier hierarchy, and the gravity drainage model are not theoretical — they are what separates projects that coordinate cleanly from ones that re-coordinate everything twice. If this saves you time on a project, consider supporting its continued development.